Roulette winning strategies

  1. Bonus Codes For No Deposit Online Casino: Still, when you listen to Gural describe the tracks tenuous plight early in the Governor Christie administration, the current difficulties seem a little less daunting.
  2. Latest No Deposit Casino Bonuses 2025 - Plus the fact that you can make some massive wins here is never a bad thing.
  3. Casino Games Play: However, as the UPayCard expands its services, more players start relying on it.

Online slots worth it

Craps Casino Online
This is essentially a respin feature with a walking wild.
Bet 24 Casino
Instead, the casino can adjust the house edge from 2.5% to 9%, which means you can play the slot with an RTP anywhere from 91% to 97.5%.
It is really nicely themed and the animated visuals are amazing.

Texas poker tips tricks

Winning At A Casino
Pay attention to the numerous online casino games offered with the best bonus, which apart from the pokies usually only make up a small part of the earnings.
Best Casino In World Online
Below you can see more on the Gamble feature, expanding wilds, and re spins.
Play For Free Win For Real No Deposit Slots

  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative
Saturday, September 13, 2025
No Result
View All Result
  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative
No Result
View All Result
No Result
View All Result
Home Books

Umahi clarifies work done, completion time for Lagos-Calabar Coastal highway

by ADELEKE
4 months ago
in Books
0
Umahi clarifies work done, completion time for Lagos-Calabar Coastal highway
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Umahi clarifies work done, completion time for Lagos-Calabar Coastal highway

The Minister of Works, Dave Umahi, has clarified that the Lagos-Calabar Coastal Highway project implementation, saying that it is Section One of the project that is 70 per cent completed.

Umahi made the clarification in an interview with journalists during a tour of some bridges on the Lagos-Ibadan Expressway on Thursday.

Some of you reported that I said the Lagos-Calabar Coastal Highway was 70 per cent done and will be finished by January 2026.

That is not what I said. We were dealing with section one, and then, we said, as of today, that section one, which is 47.47km, has been 70 per cent completed,” he said.

The minister said that the entire section one of the Lagos-Calabar Coastal Highway would be completed by January 2026.

Umahi said that the coastal highway would be tolled.

On the Lagos-Ibadan Expressway, which he also inspected, Umahi said, “We checked five bridges, and we discovered that we have a problem, so far, the standard headroom in bridge design is 5.6 metres.”

He noted that some of the bridges were up to 6.2 metres while some were 5.6 metres.

“The least we had was one that was 5.4 metres.”

He regretted that some of the beams were being hit by vehicles, posing dangers.

“Of the five bridges we inspected, our directive is that we are going to descend the carriageway.

“We are going to dig up to one metre and then reconstruct the carriageway,” he said

Mr Umahi said that the aim was to create headroom that would be up to 6.5 metres.

He directed that the minimum requirement henceforth would be 6.5 metres to achieve the desired results

The minister said he had directed that the Alapako Bridge in Ogun should be closed.

“The way it is now is very dangerous because a lot of the beams are compromised by vehicles.

Previous Post

Police r£scue Ghanaian women ¶bducted in Facebook love scam

Next Post

UN judge jailed for six years for modern slavery offences

Next Post
UN judge jailed for six years for modern slavery offences

UN judge jailed for six years for modern slavery offences

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© 2024 .

No Result
View All Result
  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative

© 2024 .