Power matrix roulette system

  1. Alpino Casino Login App Sign Up: Changing the weights of the factors can give you drastically different results.
  2. Casinos With Highest Slot Payouts Near Me - The best way to take advantage is to bet into them.
  3. Live Casino Online Ireland: The Australian version of the game has 38 pokies on the wheel, filled with numbers from 1 through 36, a single zero and a double zero.

Australian crypto casino Brisbane

Free Daily Bonus Game Casino New Zealand
The higher the number of paylines, the bigger chances players have to hit winning combinations.
Best Blackjack In Canada 2025
Choose Bitcoin and enter the amount you wish to draw.
The answer is no because any casino in good standing will still require the minimum amount of information from you in order to process any transactions between yourself and the provider.

Theoretical win cryptocurrency casino formula

Fairy Dust Bingo Casino No Deposit Bonus 100 Free Spins
Thats because online casino pokies Nunavut venues offer are provided by the best software studios in the industry right now.
Define Pontoon
To deposit funds to your account, you can use CoinsPaid, VISA, MasterCard, Maestro, Bank Transfer, Paysafecard, Neteller, Skrill, Interac, Ecopayz, Neosurf, Mifinity, MuchBetter, Venus Point, iDebit, INSTADEBIT, or Flexepin.
List Of Casinos In Australia

  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative
Thursday, September 11, 2025
No Result
View All Result
  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative
No Result
View All Result
No Result
View All Result
Home Books

FG to demolish 700 houses for Lagos-Calabar Highway

by ADELEKE
5 months ago
in Books
0
FG to demolish 700 houses for Lagos-Calabar Highway
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

FG to demolish 700 houses for Lagos-Calabar Highway

 

The Federal Government has announced plans to demolish 700 houses to pave the way for the ongoing construction of the Lagos-Calabar Coastal Highway.

Lagos State Controller of Works, Mrs. Olukorede Kesha, made this known during a stakeholders’ meeting on the progress of the multi-billion-naira highway project.

 

According to her, the number of houses marked for demolition is significantly lower than initially projected.

“Instead of having to demolish about 1,500 houses, we took the most economical route. Now we are left with less than 700 houses to be demolished,” she said.

Kesha praised the planning and pace of the project, revealing that Section One of the Lagos-Calabar Coastal Highway — a 47.4-kilometre stretch — had already been awarded.

She further addressed concerns raised by affected communities over the alignment of the road.

“A lot of people complained about set alignments, but we are not duty-bound to follow any alignment,” she stated. “It was set aside when somebody else was to do it, but now that it’s the Federal Government, we have to look at the most feasible, most economical route.”

Also speaking at the meeting, Minister of Works, David Umahi, emphasized the national significance of the Lagos-Calabar project, describing it as a transformative initiative that will ease traffic congestion and generate carbon credits due to its eco-friendly design.

“This project is going to evacuate all the traffic out of the town, and that will be a big plus for us,” Umahi said. “We are not only building for today. We are also building for tomorrow. And, of course, there will be a rail line in the middle. The middle is 12 metres gap.”

The minister added that some sections of the highway will feature train stations and other infrastructure to support future development.

Umahi also spoke on the challenges encountered in Section Two of the project, especially in industrial areas such as the Dangote refinery.

“We are now building a flyover that has a span of 60 metres. And then the next span is 41.6 metres, counterbalanced by the next span, and then the rest is 22, 23 metres. So, we are flying over Dangote’s refinery, Dangote’s fertilizer plant, and other conflict points,” he explained.

The minister further noted that similar construction activities have already commenced in Cross River and Akwa Ibom states, with more states to follow soon.

He also highlighted the Sokoto-Badagry legacy project, revealing that the third section, starting from Badagry, will face engineering challenges due to three kilometres of rivers along the route.

He, however, assured that four strategic solutions are being considered.

 

Umahi explained that the Lagos-Calabar project is part of four interconnected legacy projects meant to improve nationwide connectivity.

According to him, one corridor runs from Calabar through Ebonyi, Enugu, Benue, Nasarawa, Kogi, and Abuja, while another stretches from Abuja to Makurdi, Keffi, Akwanga, Jos, Bauchi, and Gombe.

The four legacy projects are all connected together and no region is left aside,” he said.

He concluded by warning the public against misuse of infrastructure.

Previous Post

INEC chairman presides over management meeting amid dismissal rumours

Next Post

Hotel owner assass!nated

Next Post
Hotel owner assass!nated

Hotel owner assass!nated

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© 2024 .

No Result
View All Result
  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative

© 2024 .