Brisbane cryptocurrency casino chickie and petes

  1. 10 Deposit Bonus Uk No Wagering: Pat Holland brings the mathematics of gambling to life in Red Joker Rules.
  2. Casino Roulette Machine Tips - You will also find a range of playing card symbols, ranging from Ace through to 9.
  3. United Kingdom Casinos Free Spins: To learn more about the game, please stay with us and keep Melbourne our Mega Moolah review.

Cherry gold crypto casino bonus code

Ireland Casino Not On Gamestop
Some boxing matches end up close, and it is difficult to put a finger on who is deserving of the victory.
United Kingdom Blackjack Rules
The game of lotto has become popular since its inception.
Besides the lack of free spins, Super Hot pokie does include a feature that could be a turning point in playing.

Best crypto casino in bristol

Best Online Casino Canada With Free Spins
Andar Bahar translates to Inside Outside, which basically describes how the game works.
Free Slot Games No Sign Up Canada
High stake pokies, on the other hand, are fast-paced and are harder to win with.
How To Win In European Roulette Uk

  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative
Tuesday, September 16, 2025
No Result
View All Result
  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative
No Result
View All Result
No Result
View All Result
Home Books

FG targets 2026 completion for Kaduna–Kano standard gauge rail line

by ADELEKE
2 months ago
in Books
0
FG targets 2026 completion for Kaduna–Kano standard gauge rail line
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

FG targets 2026 completion for Kaduna–Kano standard gauge rail line

The Federal Government has said that the Kaduna–Kano Standard Gauge Rail Line is scheduled for completion by 2026. The Minister of Information and National Orientation, Mohammed Idris, announced this in a post on his official X (formerly Twitter) account.
Idris also shared the update on the government’s infrastructure project drive.

Echoing this assurance, the Minister of Transportation, Sa’idu Alkali, disclosed that the project had recorded significant progress under the President Bola Tinubu-led administration. According to him, when President Tinubu assumed office on May 29, 2023, the Kaduna–Kano railway project was at 15 per cent completion. However, he said the figure has now risen to 53 per cent.

Alkali also revealed that funding had been secured through a bilateral agreement with the Government of China to accelerate the pace of work on the rail line. This funding, he said, is expected to help fast-track the delivery of the project and ensure its completion as promised. The Kano-Kaduna railway, with a total length of 203 kilometres, is a standard-gauge railway.

Once completed, it is expected to provide direct rail connectivity between Kano and Abuja. The China Development Bank (CDB) had in January 2025 granted a loan of €245 million ($254.76 million) for the construction of the Kano-Kaduna railway project in Nigeria.

According to a statement by the bank, the move was to provide financial support for the smooth progress of the project.

Previous Post

Protests erupt in Côte d’Ivoire as 83-year-old President Ouattara declares 4th term bid

Next Post

Mobile Court Convicts 34 for Attempting to Bribe FRSC Officials

Next Post
Mobile Court Convicts 34 for Attempting to Bribe FRSC Officials

Mobile Court Convicts 34 for Attempting to Bribe FRSC Officials

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© 2024 .

No Result
View All Result
  • Home
  • NEWS
  • POLITICS
  • Stories
  • Creative

© 2024 .